![]() | |||||
ship | |||||
新闻 | |||||
NOVATEK Completes First Ship-to-Ship LNG Transshipment in the Murmansk Region The ship-to-ship transfer was conducted at a temporary LNG Offshore Transshipment Complex in the Murmansk region within the seaport of Murmansk.
| |||||
Daewoo Shipbuilding succeeds in ship-to-ship LNG loading test Ship-to-ship LNG loading test to confirm the safety of newly built LNG carriers' tanks for the first time in the world in Okpo, Geoje Island, about 400 ...
| |||||
Two supply ships alone not enough to ensure navy can resupply fleets: documents A worker stands on a Joint Support Ship being built for the Royal Canadian Navy at Seaspan Shipyards in North Vancouver, B.C., Friday, Oct. 9, 2020.
| |||||
查看更多结果 | 修改此快讯 |
您收到此电子邮件是因为您订阅了Google快讯。 |
![]() |
发送反馈 |
没有评论:
发表评论