Please describe the preparatory

Please describe the preparatory   work or the daOy maintenance work to be done by M order b\vt you before a PSC inspection.

a) Your dally maintenai^^t

 

b) Preparatory work before PSC inspection^

At present, PSC inspection is extei^ivefy six months. Through the inspection lauthorities have thi

interest is the saving apparatus, the fire-fighting equipment and system, the water tight devices and system and other emergency equipment. Among them, USCG lays special emphasis on the oil pollution

preventing equipment and crew*s capability; AMSA gives much though to the structure deficiencies.

Therefore, the master has got well prepared for the inspection. He shall try his best to keep they

没有评论:

发表评论